Home How We Work
Five steps. You sign off at every one.
No stage starts until you have confirmed the previous one in writing. That single rule is what keeps formulas, artwork and quantities from drifting between the quote and the carton. One person follows your project through all five stages: Musk Sun — the person who quotes your project is the person who follows it through production. There is no handover to a separate sales or support team.
The five stages
Brief & formula check (Day 0)
You tell us the product, market and packaging. We screen the formula against your market's rules first — for example the EU/UK metallic magnesium position, or the EU ban on E171. You confirm the product, target market and packaging direction.
Itemized quote (within 2 business days)
A quote with product, packaging, outer carton and batch documents on separate lines, with MOQ tiers shown (500 / 1,000 / 5,000 boxes where applicable). You confirm the formula, format, quantity tier and packaging spec.
Samples (ready 7 days · dispatched 14 · delivered ~20)
Samples made to the quoted formula, with the full ingredient list. Development follows a fixed sequence: formula prototype, flavor adjustment, sweetness & acidity balance, dissolution observation, water clarity check, your sample confirmation, final formula approval. You confirm the sample itself — taste, look, dissolution — before any bulk commitment. Samples are developed and reviewed in the lab before they are packed and sent.
Production (50% deposit)
A 50% deposit starts production at the named site. You get batch photos and video from the producing site as your order runs, plus the document set for your batch. You confirm the final artwork file before printing. The production schedule is confirmed in the quote.
Dispatch (balance before dispatch)
Packing photos and video of the finished, sealed cartons and the batch documents. You pay the balance before dispatch. Freight is quoted separately, or as a DDP price on request.
Changes
Anything you change after a stage is confirmed is written back into the brief and re-confirmed before work continues — no silent substitutions, ever. That is normal: sampling exists to find problems early. Changes are re-quoted if they affect cost, and re-sampled if they affect the product.
Why the timeline holds
The 7 / 14 / 20-day sample timeline works because the producing site is matched to your dosage form at brief stage — your project is not queued behind formats a site does not specialise in. The same matching is why the producing site can be named in your quote, with its document set, before you pay anything. Sample and artwork tracks run in parallel, and dates are confirmed in writing at each stage, not estimated in a chat.
Production, on the record
You see the production — not a brochure version of it. Real line photography from partner production sites shows the stages your batch passes through between pressing and dispatch: tablet screening, bottle filling, line control, softgel drying, packing and dispatch. Video walk-throughs of the producing site are available on request, and third-party inspection before dispatch is available if you want your own inspector involved.
Request a quote
Tell us what you want to launch — product, target market, rough quantity — that is enough for an itemized quote within 2 business days.